指令TEXT / OPER行為的修改
出自 ArcoWiki
The TEXT/OPER
instruction has been modified to have a behavior that corresponds to the specific DMIS 5.2, that has changed compared to the previous version (5.0).
Execution is now synchronized and the program is stopped waiting for confirmation from the user.
Instruction TEXT/MAN
remained unchanged.